moved

and it went well. successfully moved from verizon to centurytel service area. reduced 25 ph lines down to 20. setup a 12 line hunt group and several fax/data lines. 15 active workstations with a domain / dns / file server installed. from comcast copper to dsl copper (waiting for actellis system install to be completed so we can get the 10/2 connection.)

You must be logged in to post a comment.